SAN ANTONIO ISD
|
| |||||||||||||
| |||||||||||
| |||||||||||||||||||||||||||||||||||
| |||||
| |||||||||||||
Technology Planning Committee
| |||
Existing Conditions:
2.1 The following chart represents the process used to analyze the district technology needs that are addressed in the plan.
This needs assessments seeks to address both process and product. In assessing the process, there are three foci; these include the following: a) Planning, management and Collaboration; b) Implementation evaluation; and c) Professional development.
In assessing the first process item, there are several critical components. Those include meetings with campus technology representatives, campus instructional technologists, as well as collaborative meetings with Curriculum and Instruction Department. Methods and indicators for assessing Planning, Management and Collaboration include on-site observations and formal/informal interviews.
The second process item is implementation evaluation. Components for this item include various activities, alignment to the State’s Long Range Plan for Technology, StaR Chart, and the Levels of Technology Implementation (LOTI) framework. Pre-Intervention methods and/or indicators include the district and campus StaR Chart, and the Teacher STaR Chart. Post-intervention methods include the LOTI framework as the guide for classroom observations.
The third process item is Professional Development. Professional development has several components, including curriculum and the technology competency certification plan (TCCP). Methods/indicator that will be used to assess Professional Development include workshop evaluations, formal/informal interviews, on-site observations, and document tracking via the Instructional Technology web site.
However, process is only one part of the needs assessment. The second part is the product that results from the process. In assessing the product, the impact on teaching, learning and administrative tasks is the primary focus. Critical components include frequency of technology use, incorporation of technology and educator to workstation ratio. These are assessed through a variety of indicators, including the StaR Chart as a pre/post intervention survey once a year. Also included are the campus access surveys, a survey completed by campuses on a continuous basis.
Student performance data (e.g. TAKS, TPRI), attitudinal measures, or other indicators will provide information on the long-term impact of the incorporation of technology in student learning and teaching.
Technology Needs:
2.3 The following is a summary of the technology needs and issues identified by the needs assessment.
A comprehensive needs assessment utilizing teacher/student surveys, interviews, focus group sessions, inventories and the Texas Campus STaR Chart was conducted to analyze the current status of technology in the district and determine future needs. Items analyzed included: infrastructure, hardware, software, programs, courses, student achievement, technology resources, staff development, and technical support. Findings from this needs assessment are as follows.
• Infrastructure. The District’s network infrastructure must be able to support responsive access to Internet resources through greater bandwidth, and modern up-to-date equipment, and software. The on-line student assessment programs and grade book program require responsive reliable Internet connectivity. The digital curriculum program or streaming video also requires high level of bandwidth and is reliable. The District must also be positioned to support future voice-over-IP initiatives that will place a telephone in every classroom.
Finally, the District infrastructure must continue to establish a wireless infrastructure to support the multitude of wireless laptops and personal digital assistants (PDAs) being purchased by schools and administrative staffs.
• Hardware. SAISD currently owns more than 19,600 computers that are located in its 92 campuses. Of these computers, over 49% are over five years old and, while still in use, are considered obsolete.
These numbers are tracked and assessments performed through the use of fixed assets data and through a campus self-reporting tool called the Campus Access Survey (CAS). Through fixed assets and CAS we are able to determine where the computers are located, how they are used and their age.
Other significant data is tracked and used when updating the District’s hardware access plan such as the number of labs, the hardware platform, Internet connectivity, etcetera. It is the District’s goal to provide access for all students to current technology, technology that is one – five years old. To meet this goal the District reviews the hardware assessment annually and determines the areas of greatest need. Funding is then allocated to support those areas most in need.
In order to make current technology more accessible, the District is moving toward mobile, wireless technology. This initiative will begin with high schools and the purchase of 33 mobile laptop carts with 24-wireless laptops. These laptops will be shared throughout the campus as the need permits making technology available to students, whenever they are.
Desktop computers will still be used in the areas that are served better through this type of technology such as administrative areas and Career and Technology Labs. In addition, the District is pursuing an initiative to provide a mobile, wireless laptop for every teacher. Most classrooms have computers, but few have a computer that is dedicated solely for teacher use.
As more information is available electronically and more automated resources are implemented, it is becoming critical that every teacher have a tool for accessing that information and those resources. With a mobile, wireless laptop the teacher will have a tool that can be used where they do their work – in the classroom and in the home – and that can be used to support the growing need for professional development.
• Software. Per the Campus Technology Planning Guide (http://itls.saisd.net/initiatives), SAISD has standardized the District
elementary schools on productivity tools (e.g. MS Office) and keyboarding software (e.g. Type to Learn). Continuing in that effort, two other tools remain - graphic organizers and age-appropriate multimedia tools. These are two critical tools for elementary students, as well as K-8, especially in light of the new TAKS.
Graphic organizers for all campuses were purchased in 2004-2005 school year and are currently deployed across the District (http://itls.saisd.net/go).
The district should have standardized applications supporting State and National Technology Applications standards as well as content area connections. Standardizing on appropriate software (e.g. Inspiration/Kidspiration) will allow more efficient and effective District teacher training and support and better software purchasing aligned to TEKS district-wide. This profound need has been exacerbated by the fact that while hardware has been purchased at the campus level, new software specifications exceed the technology now available at campuses.
• Student Achievement. During the period 2002-2003 school year, SAISD was 90% economically disadvantaged in comparison to a state rate of 52%. TAKS scores, while aligned with the state in the economically disadvantage group lagged behind the state scores with 65% passing math, 79% passing writing, 55% passing science, and 86% passing social studies. Groups such as Limited English Proficient students are well behind, and at grade nine only 25% pass TAKS. SAISD has the highest mobility rate of any urban district with 32.3% of students moving during the year (state rate is 21.1%). The four year dropout rate is 8.3%, but special education students dropout at a rate of 17.7% and LEP students at the rate of 11.3%.
• Staff Development. Previous to 2003 school year, professional development in regards to technology professional development has not been focused or aligned to SBEC Standards. As such, in spring 2004, the District chose to administer the Levels of Technology Implementation (LOTI) questionnaire, as well as provide training to unfunded campus technology representatives (who meet monthly), campus principals and instructional coordinators. A detailed set of reports by district and campus is available online at http://itls.saisd.net/loti/reports
The Levels of Technology Implementation (LOTI) provides each teacher, administrator and library media specialist detailed assessment that will help guide professional development in San Antonio ISD. This assessment has been completed for the last 3 years.
Based on the data from the LOTI currently being administered, is that 34% of educators are at Level 0 of the Levels of Technology Implementation (LOTI). Level 0 can be described as follows: Technology-based tools (e.g., computers) are either (1) completely unavailable in the classroom, (2) not easily accessible by the classroom teacher, or (3) there is a lack of time to pursue electronic technology implementation. Existing technology is predominately text based (e.g., ditto sheets, chalkboard, and overhead projector). This is a level lower than the Texas STaR Chart's Early Tech.
For the 2004-2005 school year, however, 34% decreased to 27%, a difference of 7%. At Level 1, the District saw a corresponding increase of 8%, increasing from 13% to 21%. At levels 3, 4, and 5 of the LOTI, the District saw small increases of 1% or more.
In 2003-2004, 17%--compared to 18% for 2004-2005 school year--of staff are at the target technology level of progress in the Texas STaR Chart. This means that while the majority of campuses may claim that they are the "Developing Tech" level of progress, more detailed assessment shows that SAISD is in greater need for targeted professional development than indicated by the Texas STaR Chart data.
This need can be addressed through increased access to hardware, standardized software purchases, and a district-coordinated technology competency certification plan (TCCP). Unfortunately, the TCCP lacks the funding for completion incentives should the entire district participate. Additional survey data collection is available online at http://lms.saisd.net/survey
• Technical Support. The District requires a technical support staff capable of supporting, maintaining, and troubleshooting routers, switches, servers, PCs, MACs, laptops (wired and wireless) and PDAs. This type of equipment is housed at schools and administrative locations. In addition, the technical staff must be able to diagnose and fix district-supported software and solve connectivity issues to Region 20 and application service providers (LightSpan).
| GOAL 1: Strategies will be developed to evaluate the levels of technology use and integration by teachers, librarians, and other professional staff. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.1.1: | Administer needs assessment that measures the Technology Implementation for every teacher, librarian and campus administrator in SAISD.
LEA LRPT Correlates: EP06, EP07, EP08, I01, I08, LAS02, TL02, TL10, TL11 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Data reports for each campus and one report for the district
Daily agendas Session evaluations Web Site – http://itls.saisd.net/lot |
||||
| 1.1.2: | Facilitate campuses updating the Texas Campus STAR Chart as well as the Teacher StaR Chart with alignment to campus improvement plans.
LEA LRPT Correlates: EP05, EP06, EP07, EP08, I01, I08, LAS01, LAS02, TL06, TL11, TL14 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Availability of the survey via the web
Weekly Memo to principals http://itls.saisd.net/ctr |
||||
| 1.1.3: | Facilitate PreK-3 teacher professional learning opportunities as they use technology to assess student learning.
LEA LRPT Correlates: EP06, LAS07, TL04, TL07, TL12 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | http://itls.saisd.net/k12h
|
||||
| GOAL 2: Teachers and professional support staff will have the opportunity to participate in staff development. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 2.1.1: | Maintain ITS website for communication, program awareness, information dissemination and to support online, web-based curriculum modules providing anytime, anywhere access to professional development resources.
LEA LRPT Correlates: I09, LAS01, LAS04, TL12 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Usage survey
Hit counter Analysis Web Site – Technology Literacy Institute’s online tutorials ((http://itls.saisd.net/tli) CD-ROM Image Server |
||||
| 2.1.2: | Acquire and implement a district-wide learning management system (a.k.a. ePath) to facilitate professional development, online learning aligned to Technology Applications Educator Standards, online assessments, and monitor NCLB requirements.
LEA LRPT Correlates: EP01, EP03, EP06, LAS07, LAS10, LAS12, TL02, TL09 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Web Site – Learning and Accountability Management Portal(http://itls.saisd.net/lamp) | ||||
| 2.1.3: | Work with campus administrators to update the list of campus technology representatives to provide monthly representation and campus staff development from each school in the district.
LEA LRPT Correlates: EP06, I09, LAS01, LAS04, LAS07, TL02, TL09, TL10 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Resources will be available via the ITS web site
Campus Instructional Technologist or Campus Technology Representative at every campus monthly meeting agendas. (http://itls.saisd.net/ctr) |
||||
| 2.1.4: | Implement a technology competency certification plan (TCCP) aligned to SBEC Technology Competencies for Teachers (I-V), the Levels of Technology Implementation, and STaR Chart that leads to Technology Lead Teacher Certification.
LEA LRPT Correlates: EP06, I09, LAS01, LAS02, LAS03, LAS04, LAS12, TL02, TL12 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Technology Comptency Certification Plan (TCCP)
Web Site: http://itls.saisd.net/tccp Web-http://itls.saisd.net/tlt |
||||
| 2.1.5: | Establish a technology lead teachers (TLT's) program as funding and availability of candidates permits.
LEA LRPT Correlates: EP03, EP06, I09, LAS01, LAS04, TL02, TL12 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Web-http://itls.saisd.net/tlt | ||||
| 2.1.6: | Implement the Advanced Leaders Academy (ALA) for campus administrators to foster technology advocacy, change methodology, and research-based methodology for impacting student achievement.
LEA LRPT Correlates: EP06, EP07, EP08, EP09, I01, I08, LAS01, LAS02, LAS08, LAS12, TL02, TL10, TL11, TL14 |
State: Original Status: Completed |
2007-2010 | Dir., Office of Instructional Technology Services
Dir., Office of Professional Learning |
Web –http://itls.saisd.net/ala
Focus Group LOTI Rubic on website |
||||
| 2.1.7: | Design and implement a self-paced learning system for SAISD employees who wish to improve their skills with Microsoft Office Suite applications. The system will include a CDROM ordering database interface and online competency assessments (a.k.a. SchoolFlix).
LEA LRPT Correlates: EP05, TL15 |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technology Services | ITS:SchoolFlix web site
Available CDROMS and competency assessment linked from the ITS:SchoolFlix website |
||||
| 2.1.8: | Collaborate with the Office of Curriculum and Instruction in the planning of the CIC monthly meeting--to include technology resources--that supports the content being presented.
LEA LRPT Correlates: EP06, EP07, EP08, I01, I08, LAS02, LAS10, TL02, TL06, TL10, TL11 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Resources will be available via the ITS web site.
Meeting Agendas Resources posted on the District's Scope and Sequence |
||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 2.2.1: | Maintain ITS web site for communication, program awareness, and information dissemination and to support online, web-based curriculum modules providing anytime, anywhere access to professional development and online registration.
LEA LRPT Correlates: I09, LAS01, LAS04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Usage survey
Hit counter Analysis Professional Development Planner Web Site- http://itls.saisd.net/pdp |
||||
| 2.2.2: | Continue to publish a quarterly eNewsletter that highlights innovative integration of technology into the curriculum, as well as information literacy and problem-solving for staff.
LEA LRPT Correlates: I09, LAS01, LAS04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Web Site | ||||
| 2.2.3: | Provide Technology Integration Academies (TIA) that are research-based and provide participants with innovative tools, instructional models, and resources. Current Academies inlcude Problem-based Learning, Digital Media, Digital Storytelling, Digital Storytelling for Special Education Situations, and others.
LEA LRPT Correlates: I09, LAS04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Available via the ITS web site
http://itls.saisd.net/tia |
||||
| 2.2.4: | Establish an online professional learning video library with examples that model technology integration at an appropriate level of technology implementation.
LEA LRPT Correlates: I09, LAS01, LAS04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services
Dir., Science Department Dir., Advanced Academic Services Department |
Web Site – http://itls.saisd.net/learn
|
||||
| 2.2.5: | Implement a Digital Citizenship initiative that enhances the existing Internet Drivers' Permit curriculum.
LEA LRPT Correlates: TL01, TL05, TL14 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | None | ||||
| 2.2.6: | Equip campus web coordinators (designated by campus principal) with the skills to take over the responsibility of creating and maintaining their campus websites--using a free open-source content management system--that facilitate access to curriculum and online learning opportunities.
LEA LRPT Correlates: LAS04, LAS12, LAS15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Resource available via the ITS web site
Campus Web Coordinator traning sessions available in the ITS Professional Development Planner Campus Content Management System website. |
||||
| 2.2.7: | Equip department web coordinators (designated by their department's director) with the skills to take over the responsibility of creating and maintaining their department websites using a content management system.
LEA LRPT Correlates: LAS04, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Resource available via the ITS web site Department Web Coordinator training sessions available in the ITS Professional Development Planner
Department Content Management System website. |
||||
| 2.2.8: | Provide online professional development using online modules and assessments delivered via the District's learning management system (ePath).
LEA LRPT Correlates: EP03, EP05, EP06, EP07, EP08, TL15 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Meeting notes.
Campus visitation notes |
||||
| 2.2.9: | Develop a joint venture with UTSA to partner pre-service student teachers with campus instructors to support digital storytelling.
LEA LRPT Correlates: TL06, TL09 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Class schedules.
Attendance rosters |
||||
| 2.2.10: | Provide digital storytelling professional development to district teacher specialists.
LEA LRPT Correlates: EP03, EP04, TL04, TL05, TL06, TL07, TL08 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services
Director of Elementary Language Arts |
Class schedules.
Attendance rosters Integration of Digital Storytelling into SAISD Scope and Sequence |
||||
| 2.2.11: | Provide on-site staff support for the use of digital storytelling resources.
LEA LRPT Correlates: |
State: Original Status: In Progress |
2007-2010
|
Dir., Office of Instructional Technology Services | Brochures
Digital Stories |
||||
| 2.2.12: | Continue to co-offer technology professional development classess in support of the elementary math curriculum.
LEA LRPT Correlates: |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technology Services and Director of Mathematics | Workshop catalog offerings | ||||
| 2.2.13: | Continue to co-offer--with Mathematics Department--technology professional development classess supporting the use of graphing calculators in the Middle School and High School
LEA LRPT Correlates: |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technology Services and Director of Mathematics | Workshop catalog offerings | ||||
| 2.2.14: | Continue to co-offer--with Mathematics Department--technology professional development classes supporting the use of Geometer's Sketchpad in the Middle School and High School curriculum.
LEA LRPT Correlates: |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technology Services and Director of Mathematics | Workshop catalog offerings | ||||
| 2.2.15: | Implement professional development sessions for appropriate staff so that they may develop additonal lessons for TILE (Technology Integrated Lessons Everywhere)
LEA LRPT Correlates: |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technolgy Services and Director of Mathematics | Workshop catalog offerings | ||||
| GOAL 3: Documentation will be kept on students’ level of technology use / integration and TEKS mastery. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.1.1: | Enable the students, teachers, and administrators of SAISD to effectively integrate technology into the teaching and learning in the District.
LEA LRPT Correlates: EP05, I08, TL01, TL05, TL06, TL08, TL09, TL13 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Professional Development Plan
LOTI Annual Assessment StaR Chart Assessment Professional Development Catalog |
||||
| 3.1.2: | Maintain a district-wide electronic grade book and attendance tracking system and develop a calendar for new campus staff training.
LEA LRPT Correlates: EP05, EP06, I08, TL01, TL05, TL06, TL07, TL08, TL09, TL13 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Plan and calendar | ||||
| 3.1.3: | Refine Middle School Technology Applications: Texas Essential Knowledge and Skills (TA:TEKS) 1 semester course curriculum that reflects a project-based approach to information problem-solving and technolgy literacy using core-curriculum.
LEA LRPT Correlates: EP02, EP05, I08, TL01, TL05, TL06, TL07, TL08, TL09, TL13 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | MS TA:TEKS curriculum Web Site | ||||
| 3.1.4: | Build virtual academic communities of student learners that enable publication of student writing and digitally recorded voices.
LEA LRPT Correlates: TL02, TL04, TL05, TL08, TL09 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | SCRIBE Web Site
Usage feedback Form/Hit Counter |
||||
| 3.1.5: | Facilitate development and dissemination of the TA:TEKS Benchmarks by grade levels and into the district's scope-n-sequence as technology activities.
LEA LRPT Correlates: EP02 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services
Curriculum & Instruction Dept. |
http://itls.saisd.net/tateks
|
||||
| 3.1.6: | Research and deploy a web log or Blog system for student and staff usage. The system is web resource for the Scribe initiative.
LEA LRPT Correlates: I09, LAS04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Scirbe resources
http://itls.saisd.net/scribe |
||||
| 3.1.7: | Develop staff development materials and conduct professional development for basic operations of Scribe resources.
LEA LRPT Correlates: EP07, TL05, TL07, TL08 |
State: Original Status: In Progress |
2007-2010
|
Dir., Office of Instructional Technology Services | Staff Development guide | ||||
| GOAL 4: Online resources and innovative curriculum will be available for students, parents and teachers. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.1.1: | Enable the students, teachers, and administrators of SAISD to effectively integrate technology into the teaching and learning in the District.
LEA LRPT Correlates: EP04, EP05, I08, TL01, TL07, TL08, TL09, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Vision 2005 District Plan
Web Site – http://itls.saisd.net/tli |
||||
| 4.1.2: | Use digital video distribution system appropriately to enhance learning so as to change the learning process, allowing for greater levels of inquiry, analysis, interest and collaboration, creativity, content production and student achievement.
LEA LRPT Correlates: EP04, EP05, I08, TL01, TL07, TL08, TL09, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services
Dir., Office of Library Media Services |
Implementation Plan
Web Site Calendar |
||||
| 4.1.3: | Continue implementation of TA: TEKS 1 semester course curriculum that reflects a project-based approach to information problem-solving and technology literacy using core-curriculum.
LEA LRPT Correlates: EP02, EP04, EP05, I08, TL01, TL07, TL08, TL09, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | MS TA:TEKS curriculum
Web Site |
||||
| 4.1.4: | Continue to model use of information problem-solving approach known as the Big6 as a way to help teachers develop activities at LOTI Level 3 and above.
LEA LRPT Correlates: EP04, EP05, I08, TL01, TL07, TL08, TL09, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Workshop sessions available – http://itls.saisd.net/pdp
Technology Integration Academies – http://itls.saisd.net/tia Middle School Technology Applications: TEKS (http://itls.saisd.net/tateks) |
||||
| 4.1.5: | Develop a TA:TEKS-based K-12 database of lesson activities that are integrated into the District's scope and sequence, and made available via the District's Curriculum Management System.
LEA LRPT Correlates: EP04, EP05, I08, LAS12, TL01, TL02, TL06, TL07, TL08, TL09, TL14, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Available via the ITS web site
Available in the District's Curriculum Management System |
||||
| 4.1.6: | TA:TEKS teachers will develop interactive tutorials used to enhance learning so as to change the learning process, allowing for greater levels of inquiry, analysis, interest and collaboration, content production and student achievement.
LEA LRPT Correlates: EP04, EP08, TL01, TL05, TL06, TL09 |
State: Original Status: In Progress |
2006-2008 | Dir., Office of Instructional Technology Services | Available via the ITS Web Site: TA:TEKS
Usage feedback Form/Hit Counter |
||||
| 4.1.7: | Provide a project-based, learning environment for female students that will introduce them to a wide range of technologies, including video production and interviewing skills, web page creation, and animation projects.
LEA LRPT Correlates: EP04, I09, TL01, TL05, TL08, TL09 |
State: Original Status: In Progress |
2006-2010 | Dir., Office of Instructional Technology Services | Implementation Plan ITS Web Site: TeamTechie Student projects. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.2.1: | Use digital video distribution system appropriately to enhance learning so as to change the learning process, allowing for greater levels of inquiry, analysis, interest and collaboration, creativity, content production and student achievement.
LEA LRPT Correlates: EP04, I01, TL07, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Usage feedback Form | ||||
| 4.2.2: | Maintain ITS web site components that incorporate digital video/audio that show staff modeling best teaching and learning practices.
LEA LRPT Correlates: EP04, I01, TL07, TL08, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Usage feedback Form/ Hit Counter | ||||
| 4.2.3: | Develop professional development for implementation of English and Language Arts SpringBoard Curriculum.
LEA LRPT Correlates: TL02, TL05, TL09, TL12 |
State: Original Status: In Progress |
2007-2010
|
Dir., Office of Instructional Technology Services
Dir., Secondary Language Arts |
Usage feedback form. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.3.1: | Maintain ITS web site components that incorporate digital video/audio that model best teaching and learning practices for staff and parents, as well as extend resources for use after-hours.
LEA LRPT Correlates: EP04, I01, LAS09, TL07, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Parent Liaison Pamphlet
Web – http://itls.saisd.net/parents |
||||
| 4.3.2: | Work in collaboration with Area Superintendent staff to facilitate literacy through technology.
LEA LRPT Correlates: EP04, I01, TL07, TL08, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | Parent Liaison Pamphlet
Web – http://itls.saisd.net/parents |
||||
| 4.3.3: | Host an annual Technology Student Product Fair to bring awareness to the district and community on how technology is being integrated in various content areas and how it is impacting student achievement. The fair will provide a way for schools to showcase their innovative uses of technology, as well as to see the projects that have been developed by fellow staff and students across the District.
LEA LRPT Correlates: EP04, I01, TL07, TL08, TL15, TL16 |
State: Original Status: Completed |
2007-2010 | Dir., Office of Instructional Technology Services | Web – http://itls.saisd.net/techfair
Approximately 1200 in attendance during the 2002-2004 Technology Student Product Fair. |
||||
| 4.3.4: | Document innovative learning strategies provided by SAISD Advanced Academic Services AVID Program.
LEA LRPT Correlates: I09, TL05 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services | DVD's, On-line video content | ||||
| 4.3.5: | Develop a play list of video clips for use in the high school sicence core coursed (Biology, Chemistry, IPC and Physics).
LEA LRPT Correlates: EP04 |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technology Services
Dir., Office of Science |
Video Playlist in DVDS system | ||||
| 4.3.6: | Continue to help model and develop math activities that correclate directly with the district scope and sequence to be used for Graebner Palm project.
LEA LRPT Correlates: |
State: Original Status: Planned |
2007-2010 | Dir., Office of Instructional Technology Services
Dir., Office of Mathematics |
Usage feedback form. | ||||
| GOAL 5: Strategies will be developed to evaluate the levels of technology use and integration by SAISD Librarians | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 5.1.1: | Administer needs assessment that measures the Level of Technology Implementation (LOTI), addressing 3 domains for SAISD librarians’ administrator in SAISD.
LEA LRPT Correlates: I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Data reports for each campus and one report for the district
Daily agendas Session evaluations |
||||
| 5.1.2: | Use the Big6 Information Problem-Solving approach to guide development of digital content focused on inquiry-based approaches.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Lesson plans and activities from each campus | ||||
| 5.1.3: | Promote approaches that foster information literacy and appropriate use of Learning Resource Centers and electronic resources such as DKC through Region 20, AIMS DC and Facts on File.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Monthly usage statistics
Session evaluation of usage |
||||
| 5.1.4: | Design and implement Technology Literacy Institute in line with SBEC Standards, including tutorials and online competency assessments.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Available tutorials and competency assessments on the ITS web site | ||||
| 5.1.5: | Implement an Internet Driver’s License program aligned to district, NCLB and state standards, especially Children’s Internet Protection ACT (CIPA)
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | K-5 campus assessment
Online assessment for students grades 6-12 |
||||
| GOAL 6: Librarians and library assistants will have the opportunity to participate in staff development. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 6.1.1: | Update the district professional development planner to maximize training opportunities for all librarians and library assistants.
LEA LRPT Correlates: I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Implementation Plan
Calendar ITS Web Site |
||||
| 6.1.2: | Maintain the LMS web site for communication, program awareness, information dissemination and support of online, web-based curriculum modules providing anytime, anywhere access to professional development.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Usage survey
Hit counter Analysis |
||||
| 6.1.3: | Collaborate with IT office to update the list of librarians who also serve as campus technology representatives to provide monthly representation and campus staff development from each school in the district.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services Dir., Office of Instructional Technology | Resources will be available via the ITS web site
Campus Instructional Technologist or Campus Technology Representative at every campus monthly meeting agendas |
||||
| 6.1.4: | Continue progress and implementation of strategic plans for district, cluster, and campus libraries.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | LMS website
CIP integration per campus |
||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 6.2.1: | Maintain LMS web site for communication, program awareness, information dissemination and to support online, web-based curriculum modules providing anytime, anywhere access to professional development.
LEA LRPT Correlates: I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010
|
Dir., Office of Library Media Services | Usage survey
Hit counter Analysis |
||||
| 6.2.2: | Continue to publish a weekly Newsletter that spotlights innovative integration of technology into the curriculum, as well as information literacy and problem-solving for librarians.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services | Available via the LMS web site | ||||
| 6.2.3: | Provide technology training classes that are research-based and provide participants with innovative tools, instructional models, and resources.
LEA LRPT Correlates: I03, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services Dir., Office of Instructional Technology | Available via the LMS web site | ||||
| GOAL 7: Online resources and innovative curriculum will be available for students, parents and librarians. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 7.1.1: | Enable the students, teachers, librarians and administrators of SAISD to effectively integrate technology into the teaching and learning in the District.
LEA LRPT Correlates: I03, I07, I08, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services Dir., Office of Instructional Technology | Plan and calendar
Union catalog |
||||
| 7.1.2: | Use a digital video distribution system appropriately to enhance learning so as to change the learning process, allowing for greater levels of inquiry, analysis, interest and collaboration, creativity, content production and student achievement.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services Dir., Office of Instructional Technology | Implementation Plan
Web Site Calendar |
||||
| 7.1.3: | Continue to model use of information problem-solving approach known as the Big6 as a way to help librarians and teachers develop activities at LOTI Level 3 and above.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Library Media Services Dir., Office of Instructional Technology | Available via the ITS web site | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 7.2.1: | Use digital video distribution system appropriately to enhance learning so as to change the learning process, allowing for greater levels of inquiry, analysis, interest and collaboration, creativity, content production and student achievement.
LEA LRPT Correlates: I03, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology & Services Dir., Office of Library Media Services | Usage feedback Form | ||||
| 7.2.2: | Maintain ITS web site components that incorporate digital video/audio that show staff modeling best teaching and learning practices.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology & Services Dir., Office of Library Media Services | Usage feedback Form/ Hit Counter | ||||
| GOAL 8: Strategies will be developed to support library technology infrastructure and provide student use and access of campus libraries. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 8.1.1: | Maintain ITS web site components that incorporate digital video/audio that show staff modeling best teaching and learning practices.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services & Dir., Office of Library Media Services | Parent Liaison Pamphlet
LMS on-line Parent Resources |
||||
| 8.1.2: | Work in collaboration with Area Superintendent staff to facilitate literacy through technology.
LEA LRPT Correlates: I03, I07, I08, LAS03, LAS05, TL04 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Instructional Technology Services & Dir., Office of Library Media Services | Parent Liaison Pamphlet
LMS on-line Parent Resources |
||||
| GOAL 9: Strategies will be to develop and maintain a local area and wide area network technology infrastructure for support of students, teachers, librarians, and other professional staff. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 9.1.1: | Maintains and manages servers, router, and switches for connectivity to local area network and wide area network resources.
Year 1: $400,000
Year 2: $400,000
Year 3: $400,000
LEA LRPT Correlates: I01, I05, I06, I07, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | Access to Region 20 reports, electronic mail, on-line Interim Assessments, and the Internet. | ||||
| 9.1.2: | Maintains high speed connectivity for all school locations.
Year 1: $415,200
Year 2: $415,200
Year 3: $415,200
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | Access to Region 20 reports, electronic mail, on-line Interim Assessments, and the Internet. | ||||
| 9.1.3: | Maintains a 100 Mbps or greater connection to the Internet in support of schools and administrative locations.
Year 1: $204,000
Year 2: $204,000
Year 3: $204,000
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | Fast access to Internet.
Monitoring of connection speed with software (Cybergauge) |
||||
| 9.1.4: | Provides communication infrastructure in support of district web site for communications with parents and community.
Year 1: $50,000
Year 2: $50,000
Year 3: $50,000
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | Web site at www.saisd.net.
Usage survey and hit counter analysis |
||||
| 9.1.5: | Manages and maintains a Helpdesk and technical staff for support of servers, routers, switches, PCs, Macs and other computer related hardware and software at the schools for the support of integration into teaching, learning, and school operations.
Year 1: $152,000
Year 2: $152,000
Year 3: $152,000
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | Five people assigned to Helpdesk.
Area support teams consisting of 12 people. Daily log of Helpdesk jobs received and completed |
||||
| 9.1.6: | Replace obsolete technology and infrastructure on a scheduled basis for maximum efficiency and use.
Year 1: $0
Year 2: $9,000,000
Year 3: $0
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | State-of-the-art networking hardware will be replaced as needed at all SAISD schools. | ||||
| 9.1.7: | Yearly maintenance on all routing/switching equipment at schools
Year 1: $554,000
Year 2: $554,000
Year 3: $554,000
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: In Progress |
2007-2010 | Dir., Office of Network and Technical Services | SMARTnet maintenance agreements | ||||
| 9.1.8: | Manage and maintain a Helpdesk and technical staff for support of servers, routers, switches, PCs, Macs and other computer related hardware and software at the schools for the support of integration into teaching, learning, and school operations.
LEA LRPT Correlates: I01, I04, I05, I07, I08, I09 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and Systems Integration
Director, Office of Networking and Technical Services |
Five people assigned to Helpdesk. Area support teams consisting of twelve people. Daily log of Helpdesk jobs received and completed. | ||||
| GOAL 10: Provide Telecommunications Services to include replacement of PBX phone systems with voice-over-IP (VOIP) systems based on SAISD's transition plan. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 10.1.1: | Ensure best pricing for local telephone service through multi-year contract.
LEA LRPT Correlates: I02 |
State: Original Status: In Progress |
2007-2010 | Director, Office of Network & Technical Services | Renewable contract up to five consecutive years. | ||||
| 10.1.2: | Apply for e-rate funding to recoup 90% of money spent on local telephone service at schools within the District.
LEA LRPT Correlates: I02 |
State: Original Status: In Progress |
2007-2010 | Director, Office of Network & Technical Services | Receipt of funding. | ||||
| 10.1.3: | Maintain Local Telephone Service at Administrative Offices and Schools within the District.
LEA LRPT Correlates: I02 |
State: Original Status: In Progress |
2007-2010 | Director, Office of Network & Technical Services | Customer feedback. | ||||
| 10.1.4: | Transition to voice-over-IP systems as appropriate.
LEA LRPT Correlates: I01, I08 |
State: Original Status: Planned |
2007-2010 | Patricia Holub, Executive Director, Technology Initiatives and Support | Operation of a voice-over-IP system | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 10.2.1: | Maintain long distance telephone service at Administrative Offices and Schools within the District.
LEA LRPT Correlates: I02 |
State: Original Status: In Progress |
2007-2010 | Director, Office of Network & Technical Services | Customer feedback. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 10.3.1: | Provide cellular phone service for staff directly involved in the transport and supervision of students and for on-site campus support.
LEA LRPT Correlates: I01, I08, LAS01 |
State: Original Status: Planned |
2007-2010 | Patricia Holub, Executive Director, Technology Initiatives and Support | Contract for cellular service for district staff. | ||||
| GOAL 11: Provide management, service and support to make all SAISD software applications and supporting systems available 99% of the time. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 11.1.1: | Maintain and manage current online applications to include electronic grade book, AnyQueue, Winocular, SuccessMaker, Subfinder, iData Portal, Avatar learning management system and Food Services Point-of-Sale system.
LEA LRPT Correlates: I01, I08, TL09, TL10, TL15, TL16 |
State: Original Status: In Progress |
2007-2010 | Director, Office of Operations and Systems Integration | Operational and application statistical reports; system and error logs. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 11.2.1: | Manage and maintain department and campus web pages.
LEA LRPT Correlates: I08, I09, LAS08, LAS11, TL04, TL16 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and Systems Integration | Online access to information for SAISD departments and schools. | ||||
| 11.2.2: | Manage and maintain Web server and Intranet server.
LEA LRPT Correlates: I01, I08, LAS08, LAS11, TL09, TL16 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and Systems Integration | Access to San Antonio ISD web sites on the Internet and Intranet. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 11.3.1: | Maintain and manage Exchange servers for administrative e-mail and user accounts.
LEA LRPT Correlates: I01, I05, I08, TL16 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and System Integration | Ability to create new user e-mail accounts and manage existing accounts. Access by administrators to their e-mail. | ||||
| 11.3.2: | Maintain and manage I-Mail server for student e-mail and user accounts
LEA LRPT Correlates: I01, I05, I08, TL16 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and Systems Integration | Ability to create new user e-mail accounts and manage existing accounts. Access by administrators to their e-mail. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 11.4.1: | Continued monitoring and maintenance of servers and equipment associated with District Internet access.
LEA LRPT Correlates: I01, I05, I08, I09, LAS11, TL12 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and System Integration | System reports and ability of users to access the Internet. | ||||
| 11.4.2: | Manage and maintain SPAM filtering software.
LEA LRPT Correlates: I01, I05, I08, I09, TL09 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and Systems Integration | Customer satisfaction reports and system reports. | ||||
| 11.4.3: | Manage and maintain virus filtering software.
LEA LRPT Correlates: I05, I07, I08, I09, TL09 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and System Integration | Customer satisfaction reports and system reports. | ||||
| 11.4.4: | Manage and maintain DNS servers.
LEA LRPT Correlates: I05, I07, I08, I09, TL09 |
State: Original Status: Planned |
2007-2010 | Director, Office of Operations and Systems Integration | System reports. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 11.5.1: | Replace Intranet and I-Mail servers
LEA LRPT Correlates: I05, I07, I08, I09, TL09 |
State: Original Status: Planned |
2008-2009 | Director, Office of Operations and System Integration | System reports | ||||
| 11.5.2: | Replace Exchange servers, DNS and Web servers.
LEA LRPT Correlates: I05, I07, I08, I09, TL09 |
State: Original Status: Planned |
2009-2010 | Director, Office of Operations and System Integration | System reports. | ||||
| GOAL 12: Provide project management support for technology related initiatives. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 12.1.1: | Track and oversee the implementation of District approved plans involving new technology and automation of current processes.
LEA LRPT Correlates: LAS01, LAS02, LAS04, LAS05 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Initiatives and Support | Meeting project goals and timelines. | ||||
| 12.1.2: | Oversee procurement process for technology purchases in excess of $25,000.
LEA LRPT Correlates: LAS01, LAS02 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Initiatives and Support | Establishment of contracts for computer hardware and software through the procurement process. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 12.2.1: | Screen and approve all requests for hardware and software and ensure that all purchases are alinged to the appropriate Campus Improvement Plan and the District ePlan.
LEA LRPT Correlates: I01, I02, I04, LAS01, LAS02, LAS05, TL09 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Initiatives and Support | Purchase order logs | ||||
| 12.2.2: | Develop and maintain a plan for replacement of computer equipment as it reaches obsolecence.
LEA LRPT Correlates: I01, I02, I04, LAS01, LAS02, TL09 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Intiatives and Support | Fixed assets data on computer equipment. | ||||
| 12.2.3: | Oversee technology procurement and ensure that equipment purchased meets San Antonio ISD standards for hardware specifications and for service and support.
LEA LRPT Correlates: I01, I02, LAS01, LAS02, TL09 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Initiatives and Support | San Antonio ISD hardware standards and scope of work for computer equipment maintenance and support. | ||||
| GOAL 13: Provide access to current technology for all teachers, administrators and students. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 13.1.1: | Provide appropriate technology to schools for student use.
LEA LRPT Correlates: I01, I02, I04, LAS01, LAS02, TL09 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Initiatives and Support | Purchase order logs and fixed assets data. | ||||
| 13.1.2: | Ensure campuses are adhering to the Campus Base Technology Plan when making technology purchases.
LEA LRPT Correlates: I01, I02, I04, LAS01, LAS02, TL09 |
State: Original Status: Planned |
2007-2010 | Executive Director, Technology Initiatives and Support | Campus Base Technology Plan and Campus Access Survey | ||||
| GOAL 14: Plan for coordinating activities funded through the Ed Tech program with technology-related activities supported with funds from other Federal, State and local sources. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 14.1.1: | Encourage the effective integration of technology resources and systems with online teacher training and curriculum development to increase student achievement through the use of technology for elementary and middle schools.
LEA LRPT Correlates: EP01, EP03, TL08 |
State: Original Status: Planned |
2007-2010 | Executive Director, Curriculum and Instruction | Professional development is tracked through an online web conferencing system. Teachers are required to submit student products with the appropriate lesson plans which will be shared among their peers. All teachers are required to present one of their technology integration products at the TARGET Fair. | ||||
| GOAL 15: Provide telecommunication infrastructure and related technology for new SAISD campus next to Mission Creek subdivision on South Presa Street. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 15.1.1: | Purchase and install servers, routers, access points and switches for wired and wireless connectivity to local area network and wide area network resources.
LEA LRPT Correlates: I01, I05, I08, I09 |
State: Original Status: Planned |
2008-2009 | Dir., Office of Network and Technical Services | Access to Region 20 reports, electronic mail, on-line interim assessments and the Internet. | ||||
| 15.1.2: | Provide equipment and services for local and long distance telephone service.
LEA LRPT Correlates: I01 |
State: Original Status: Planned |
2008-2009 | Dir., Office of Network & Technical Services | Customer feedback. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 15.2.1: | Provide appropriate technology to the school for student use.
LEA LRPT Correlates: I01, I02, I04, LAS01, LAS02, TL09 |
State: Original Status: Planned |
2008-2009 | Executive Director, Technology Initiatives and Support | Purchase order logs and fixed assets data. | ||||
| 15.2.2: | Provide appropriate technology to the school for staff use.
LEA LRPT Correlates: I01, I02, I04, LAS01, LAS02, TL09 |
State: Original Status: Planned |
2008-2009 | Executive Director, Technology Initiatives and Support | Purchase order logs and fixed assets data. | ||||
Method of application for formula funds: Local Application
Budget year 2007 | ||
| Budget item | Cost | Funding Sources with amount per source |
| Staff Development | $2,368,966.00 | 79.5% Local, 20% State Technology, 0.5% NCLB |
| Telecommunications & Internet Access | $1,809,539.00 | 75% E-rate, 25% Local |
| Materials & Supplies | $135,000.00 | Local |
| Equipment | $2,025,200.00 | 36% Local, 1% State Technology, 63% E-rate |
| Maintenance | $1,331,000.00 | 45% Local, 55% E-rate |
| Miscellaneous Expenses | $2,000.00 | Local |
| Total | $7,671,705.00 | |
Budget year 2008 | ||
| Budget item | Cost | Funding Sources with amount per source |
| Staff Development | $2,368,967.00 | 79.5% Local, 20% State Technology, 0.5% NCLB |
| Telecommunications & Internet Access | $2,359,539.00 | 75% E-rate, 25% Local |
| Materials & Supplies | $135,000.00 | Local |
| Equipment | $29,332,200.00 | 37% Local, 1% State Technology, 62% E-rate |
| Maintenance | $1,331,000.00 | 45% Local, 55% E-rate |
| Miscellaneous Expenses | $2,000.00 | Local |
| Total | $35,528,706.00 | |
Budget year 2009 | ||
| Budget item | Cost | Funding Sources with amount per source |
| Staff Development | $2,368,967.00 | 79.5% Local, 20% State Technology, 0.5% NCLB |
| Telecommunications & Internet Access | $1,809,539.00 | 75% E-rate, 25% Local |
| Materials & Supplies | $135,000.00 | Local |
| Equipment | $10,415,200.00 | 75% Local, 5% State Technology, 20% E-rate |
| Maintenance | $1,331,000.00 | 45% Local, 55% E-rate |
| Miscellaneous Expenses | $2,000.00 | Local |
| Total | $16,061,706.00 | |
Evaluation Method:
5.2 Evaluation Methods
Data collection and analysis will occur in three areas: a) Process evaluation; b) Product evaluation; and c) Monitoring or formative evaluation to provide technical assistance and guidance for adjustments or revisions of plan strategies. The methods/indicators may include, but not be limited to, those discussed below.
This evaluation seeks to address both process and product. In evaluating the process, there are three foci; these include the following: a) Planning, management and Collaboration; b) Implementation evaluation; and c) Professional development.
In evaluating the first process item, there are several critical components. Those include meetings with campus technology representatives, campus instructional technologists, as well as collaborative meetings with Curriculum and Instruction Department. Methods and indicators for assessing Planning, Management and Collaboration include on-site observations and formal/informal interviews.
The second process item is implementation evaluation. Components for this item include various activities, alignment to the State’s Long Range Plan for Technology, Texas StaR Chart, and the Levels of Technology Implementation (LOTI) framework. Pre-Intervention methods and/or indicators include the district, campus, and teacher StaR Chart, and the LOTI framework as an observational tool. Post-intervention methods include the LOTI Assessment that will be administered as funds permit.
The third process item is Professional Development. Professional development has several components, including curriculum and the technology competency certification plan (TCCP). Methods/indicator that will be used to assess Professional Development include workshop evaluations, formal/informal interviews, on-site observations, and document tracking via the Instructional Technology web site.
However, process is only one part of an evaluation. The second part is the product that results from the process. In evaluating the product, the impact on teaching, learning and administrative tasks is the primary focus. Critical components include frequency of technology use, incorporation of technology and educator to workstation ratio. These are evaluated through a variety of indicators, including the Teacher StaR Chart as pre/post surveys administered annually. Also included are the campus access surveys, a survey completed by campuses on a continuous basis.